Major construction project

Published:  12 March, 2025

To ensure the safe, effective and efficient transfer of plant equipment into the basement energy room of a new residential tower block in London, a major construction project leveraged the advantages of appointing Hoist & Winch as its supplier of turnkey lifting equipment.

Tasked with meeting the requirements of a technically challenging brief, Hoist & Winch demonstrated why it has become the nation’s go-to solution provider of high-quality lifting systems.

Hoist & Winch has extensive experience in all kinds of construction and industrial lifting applications. The company offers sales, installation, service, inspection, repair and hire services, with a special emphasis on project work. Supplying the optimal solution, with safety as the number one priority, is always the objective.

During the design phase, after formal tender and contract award, Hoist & Winch set about identifying the optimal solution by carefully assessing the specific lifting requirements. The project required the installation of hoists on both the upper and lower ground floor levels to ensure the successful lifting and transfer of large energy plant. It was clear from the outset that the solution would need to overcome the issue of very tight headroom clearances due to the size of the equipment.

After thoroughly considering all aspects of the project, Hoist & Winch was able to put forward its proposal, recommending two William Hacket low-headroom manual hoists, both with a hand-geared trolley. Offering a safe working load (SWL) of 2.5t each, the hoists provide 8m of lifting height and run on beam lengths of 8.5m and 7.0m.

Hoist & Winch duly submitted its design proposal, including drawings and structural calculations, for approval by engineers at the main contractor. Following approval, the company commenced manufacture before delivery to site.

Click here for the full release

t: 08450 171126

e: sales@hoistandwinch.co.uk

w: www.hoistandwinch.co.uk

Sign up for the PWE newsletter

Latest issue

To view a digital copy of the latest issue of Plant & Works Engineering, click here.

View the past issue archive here.

To subscribe to the journal please click here.

Poll

"How is your manufacturing business preparing for a net Zero target?"






Twitter